Aqualume Journal

A Step-by-Step Guide for Water Cooler Installation

This guide breaks the process into clear, actionable steps so a first-time user can safely install and test bottleless water dispensers.

By Victor Schwartz · Chief Operating Officer, Aqualume ·

December 4, 2025

· 20 min read
Aqualume Cascade bottleless water cooler in an office kitchenette with an open under-sink cabinet and a technician tool bag on the floor in Glendale, California

7-day free trial

Use it for a week before you sign

7-stage filtration

The same system on all seven models

From $80/mo*

Starting price per dispenser

LA · OC · Inland Empire

Local install and service

Aqualume Gulfstream bottleless water cooler in a nonprofit office with bookshelves in Costa Mesa, California

Step-by-Step Guide to Water Cooler Installation and Setup for First-Time Users

Most people searching for water cooler installation have one of two machines in front of them. A bottled cooler, top-load or bottom-load, is a plug-in-and-seat-the-jug job you can do yourself. A bottleless cooler is different: it gets plumbed into a cold water line, so the setup is really a small plumbing job. We rent bottleless coolers in Southern California, and on those our technicians do the installation for free. If that’s you, most of this guide is what to expect rather than what to do. If you own a unit and are installing it yourself, the steps below cover both kinds, from tools and picking the spot through priming, connecting a bottleless water cooler to the supply and flushing the filters. Cleaning schedules and troubleshooting come after. One honest note up front. Where a step involves your building’s plumbing and you aren’t comfortable with it, call a plumber. A slow leak behind a cabinet costs far more than the visit.

The water cooler installation steps, in order

Every install, bottled or bottleless, runs in roughly the same order. Pick and prepare the spot. Get the tools out. Unbox the cooler and look it over. Then connect water and power. Prime it. Check the temperatures, and check every joint for drips. The order matters more than speed. Planning and safety come before anything mechanical, because connecting first and checking second is how a water cooler installation ends up with a wet floor. We start with the tools and the spot, then unboxing; the safety checks come last, before any water goes in, and then the bottled and bottleless paths split.

Tools and supplies for the installation

Aqualume Glacier bottleless water cooler in a real-estate office front room in Irvine, California

You don’t need much. A small kit and a few consumables will cover most installs without a second trip to the hardware store, and laying them out before you start means nothing gets done in a hurry. Here’s what we’d have on hand, and what each item is for. Renting a bottleless cooler from us? Skip this part: the installation is ours to do, and it’s free.

  1. A wrench set and adjustable pliers, for fittings and any drain connection.
  2. Phillips and flat screwdrivers. Access panels and brackets need both.
  3. Teflon tape for threaded joints, and a plumber’s wrench to finish them.
  4. A bucket and old towels for spills. Gloves for handling.

That kit handles nearly everything: compression fittings, a suction tube in a bottom-load cooler, the lot. Once it’s laid out, the next decision is where the cooler goes. That one matters more than any tool.

What each tool is for during installation

What each item actually does. The wrench and pliers tighten fittings; screwdrivers open panels and fix brackets. Teflon tape and compression fittings are what make a water connection hold without weeping. A utility knife and hose clamps help when you’re cutting and routing tubing for a bottleless install. The bucket and towels are for the moment you open a line or drain a reservoir, which always lets out more water than you expect. Gloves and eye protection matter more than they sound: a full 5-gallon bottle is heavy, and flushing a new filter can spit carbon dust.

Then choose the spot for the installation. Get this wrong and you’ll be moving a full cooler, or re-running a water line, a week later.

Choosing and preparing the installation spot

A good spot is level and stable, close to a grounded outlet, and close to water if the cooler is bottleless. Leave a few inches behind and at the sides so the compressor can breathe and you can reach the back. Keep it out of the main walkway, where someone will clip it with a cart. For a plumbed-in cooler installation, the important things are a shut-off valve you can reach and, for units that need one, a drain. The cold supply under a break-room sink is often the easiest source. One visitor with a student break room asked us for exactly that: a minimally invasive install off the sink’s cold supply. Check the floor is solid and level before the install, too.

Spot chosen? Open the box carefully. Damage is easier to sort out before the install than after.

Unboxing and inspecting the water cooler

Unboxing is where you catch a cracked panel before the installation, not after it’s plumbed in. Look at the carton first for crushed corners or punctures. Then lift the cooler out and check the panels, any loose parts, and the bag of accessories: suction tube, filters, manual. Match the model and serial labels to your order, and keep the manual and warranty card somewhere you’ll find them. Peel off the protective film. Wipe the outside with a mild detergent. If anything is missing or damaged, tell the seller that day, with photos.

Last step before any water or power goes near the dispenser: safety. It’s quick, and it’s the installation step people skip.

Safety before the installation: power, water, lifting

Three things can go wrong here. Shock. Water on the floor. A pulled back. Plug into a properly grounded outlet, not an extension cord, and make sure the circuit isn’t already loaded with a microwave and a kettle. Before any plumbing work, cutting or connecting, shut off the water and bleed the pressure out of the line. Lift a full 5-gallon bottle with your legs, or with two people. On a bottleless install, clip the tubing down so nobody trips on it. And if you find odd piping, old valves that won’t close or wiring you don’t trust, stop. A licensed plumber or electrician costs less than the repair.

With that done, the bottled and bottleless installation paths split. Bottled first, since it’s the one most people do themselves.

Bottled water cooler setup: top-load and bottom-load

A bottled water cooler installation is either top-load or bottom-load. Either way the job comes down to three things: handle the bottle cleanly, seat it properly on the probe or suction tube, and prime the lines so there’s no air in them. The difference is mechanical. On a top-load cooler you lift the bottle, turn it upside down and drop it onto a probe. On a bottom-load you stand the bottle in a cabinet at the bottom and push a suction tube into it. Both need a leak check and a first power-on to see that the hot and cold sides work. Steps for each follow.

How to install a top-load water cooler

Top-load is the version that hurts backs. A full jug is heavy and awkward, and a fumbled one floods the floor. Go slowly, in this order:

  1. Take the cap off and look at the bottle neck for cracks.
  2. Lift with your legs, or get a second person; clear the cooler top.
  3. Turn it over in one movement and let it settle onto the probe.
  4. Pour short bursts from each tap, then look for drips.

Then prime it properly. Air trapped in the lines is why a new cooler sputters, and it’s easy to clear.

Top-load install, in more detail

The whole top-load install is about getting a heavy bottle onto the probe without dropping it or touching the opening. Check the seal and take off any dust cap. Lift with two people, or a lifting aid if you have one, and turn the bottle over above the reservoir. Lower it until it seats. You’ll hear water start to fill the reservoir. Keep a towel close, because there is usually a drip. Once it’s seated, run the cold tap and then the hot tap for a few seconds each, and look at the seal and probe for leaks.

Priming is what clears the airlocks. Skip it and the taps will spit and sputter at the first few users.

How to install a bottom-load water cooler

Bottom-load coolers spare your back during installation. Their catch is the suction tube. Open the bottom cabinet and stand the bottle upright on the platform. Fit the cap or adapter with the tube onto the neck. Run the tube so it has no sharp bends or pinch points, because a kinked tube looks exactly like a broken pump. Make sure the cap seats firmly. Close the cabinet, fix any clips that hold the tube, then prime with short bursts from each tap. Watch the fittings while you do.

With the bottle in, prime it. That gets the air out and gets the cooler ready to test.

Priming the water cooler so it doesn't sputter

Air in the lines makes the taps cough. On a bottled water cooler, open the cold tap on its own and let it run in short bursts until the stream steadies. Then do the same with the hot tap. Go one tap at a time; opening both together makes it harder to tell which side is still holding air. Sealed probe systems need a few short pours so the pressure evens out. You’re done when the water comes out in a smooth stream with no splashing or sputter. Still coughing? Look for a kink in the tubing, or a bottle that isn’t seated, and prime again.

Primed and pouring? Now plug it in to finish the install, and give it time to reach temperature.

Powering on and testing a bottled water cooler

Plug the cooler into a grounded outlet of its own and set the thermostats where the manual says. Then wait. Cold water takes hours to come down to temperature; hot is much quicker. Your manual gives the times for your model, and they’re worth reading before you decide something is broken. While it settles, try both taps. Look at the seals and joints for drips. Watch the drip tray too, because it can fill on day one. Still not at temperature after the manual’s time? Adjust the thermostat, or check the troubleshooting section further down this guide.

That’s the bottled side. A bottleless water cooler installation adds plumbing, which is where most of the risk sits.

Bottleless water cooler installation, step by step, for units you own

Aqualume Cascade bottleless water cooler in a creative agency lounge with a sofa in Glendale, California

A bottleless water cooler installation is a plumbing job first. Someone checks the water and power at the spot, connects the cooler to a cold water line with the right adapter (often a T-fitting), installs and flushes the filters, routes a drain line if the unit has one, and then powers it up and tests it. From then on the cooler draws from the building’s water, through its own filtration, which is why the checks and leak tests matter. When you rent a bottleless cooler from us, our technicians do all of this as part of a free installation. If you’re installing one you own, the sections below go step by step.

Checking the plumbing and electrical requirements before installation

Before any plumbing, find out whether the site can take a plumbed-in cooler installation at all. Measure the water pressure and compare it with the manufacturer’s range. Find a shut-off valve close enough to isolate the cooler for service. Check the outlet is grounded and the right voltage, and ask whether a dedicated circuit makes sense. You’re looking for red flags: pipe you can’t safely tap into, or no drain where the unit needs one. Either means calling in a plumbing professional.

What a bottleless installation needs, in plain terms

A cold water line within reach of where the cooler will stand. A shut-off valve, so the cooler can be isolated without turning off the whole floor. A grounded outlet. For reverse osmosis units that send reject water to drain, a drain path. That’s the whole list, and plenty of break rooms already have it, often under the sink. What varies is the distance. A cooler right next to the sink is a short, simple run. One across the room means tubing along a wall or through a cabinet, and someone has to decide where it goes so nobody trips on it or kicks it loose. Older buildings add their own surprises: valves that haven’t been turned in years and won’t close fully, or supply pipe in a different material from the fittings in your kit. That’s the point to stop and bring in a plumber rather than force a fitting. If you’re renting from Aqualume, these are the things our technicians check before they connect anything, and the installation is free. If the site can’t take a plumbed-in cooler, we’d rather tell you than rent you one. Bottled delivery is the better answer when there’s no water line nearby, and that’s fine.

If in doubt, ask before anyone cuts a pipe.

A plumbing and electrical checklist to run before you install anything

Run through this before you start the installation. Is the supply pressure inside the manufacturer’s range? Is there a local shut-off valve? Is there a way to drain water when you flush the filters, and, for reverse osmosis units, somewhere for the reject water to go? Check the outlet is grounded with steady voltage. If there’s no grounded outlet near the spot, that’s an electrician’s job, not an adapter’s. Some reverse osmosis setups also need an air gap fitting on the drain. Know that before you install anything.

Do that properly and the plumbing connection itself is straightforward, because you’ll have the right fittings.

Connecting a bottleless water cooler to the building's water line

Most bottleless coolers connect to the plumbing with a T-adapter or a compression fitting on the cold supply. Turn the water off and open a tap to bleed the pressure. Fit the T-adapter on the cold feed with the correct ferrule or compression nut. Wrap threaded joints in Teflon tape, tighten by hand, then finish with a wrench. Don’t overdo it. Plastic fittings crack when they’re forced, and crushed tubing leaks. Then open the shut-off slowly and watch every joint. Tighten only the ones that weep.

Good seals now mean no slow drip behind a cabinet next month. Next come the filters.

Installing and flushing the filters

New filters shed carbon dust and manufacturing grit. Flush them before anyone drinks. Mount the housings as the installation manual shows. Put the cartridges in with the flow arrow pointing the right way, then hand-tighten the housings. Open the supply and run water through for the volume or time the filter maker specifies. Watch for pressure drops and leaks. Once the flow is steady and clear, the filters are seated. On our machines that’s seven stages, from sediment through to a final taste-and-odor polish.

Flushed and clear, the drinking side is done. If the unit has reverse osmosis, the drain is next.

Connecting the drain line, for reverse osmosis and some bottleless systems

Reverse osmosis units send some water to drain, so the drain line has to be done right during installation. Fit the drain saddle or air-gap adapter the way your local code asks. Keep the line sloping downhill all the way, so water never sits in it, and clamp the tubing so it isn’t pulling on the fitting. Run a flush cycle and watch the whole path for leaks. If the code calls for a certified fitting, use one, or get a plumber. A badly routed drain can let dirty water back toward the filters, which defeats the point.

Plumbing and filters done. Now switch the water dispenser on, and find out whether it does what it should.

Switching on and testing a bottleless water cooler after installation

Final installation checks. Open the supply and look for leaks and a steady flow. Plug the cooler in. Then watch the temperatures and the flow over the first day or two, and the joints most of all. Run the extra flush the filter maker recommends, then taste the water and smell it. Give the refrigeration time to reach temperature before touching the thermostat. Keep checking the fittings and the drain for slow leaks in that first stretch, and go round the connections again after a day, because fittings settle.

Once it’s running, the cooler and its plumbing need looking after. Not much, but on a schedule.

Cleaning and maintaining a water cooler so it keeps pouring well

Cleaning a water dispenser keeps the water tasting right and the flow steady. The small jobs are weekly or monthly: the drip tray, the taps, the outside. The bigger one is a full sanitization of the inside, which manufacturers usually put at every few months. Filters get replaced on their own schedule. Some coolers have built-in sanitizing features, but those cut the manual work rather than end it. For coolers we rent, the service side is ours: our technicians handle scheduled service visits, and they change the filters about once a year (the filters are billed separately). The rest of this section is for anyone looking after their own.

Routine cleaning for water coolers

Routine cleaning of a water dispenser is the parts people touch and the parts that collect drips. Wipe the outside. Empty the drip tray and sanitize it. Clean around the taps and buttons, where grime builds up first. Mild soap and warm water is enough for most of it, or a sanitizer the manufacturer approves. Skip harsh solvents; they cloud plastic. Once a month, look at the seals and gaskets and clean or replace any that look worn. That’s what keeps the cooler clean between deep sanitizations.

ComponentCleaning FrequencyProcedure
Drip TrayWeeklyRemove, empty, wash with mild soap, rinse, dry, and reinstall
Exterior SurfacesMonthlyWipe with soft cloth and mild detergent; avoid abrasives
Spigots/Dispense AreaWeeklySanitize with food-safe disinfectant, rinse thoroughly

Keep up with the small jobs and you’ll rarely need an emergency plumbing or service call. The deep clean is next.

A weekly and monthly cleaning routine

A simple rhythm works for any water dispenser. Every week, empty and wash the drip tray and wipe the dispense area with mild detergent or a food-safe sanitizer. Every month, clean the outside properly and check the seals and hoses. Keep a small kit by the cooler: soft cloths and gloves, some detergent, a little brush for the corners. If the water starts to smell, looks discolored or slows down, don’t wait for the schedule. Deep clean it.

Every so often the inside needs a proper sanitization, reservoir and all. That’s a bigger job.

Deep sanitization, every few months

A deep sanitization drains the reservoir, opens up the parts water touches, and runs a sanitizing solution through to kill off biofilm. Use the sanitizer and dilution your manufacturer approves. A mild bleach solution is common, but check first. Drain the reservoir. Apply the solution to the inside surfaces and leave it for the contact time on the label. Then rinse, and rinse again, until there’s no smell left. Work with the windows open, and wear gloves when handling concentrate. Before it goes back into service, reassemble everything and check for leaks.

EntityAttributeValue
Reservoir SanitizationFrequencyEvery few months, per the manual
Sanitizing AgentCommon OptionsDiluted bleach or manufacturer-approved sanitizer
Rinse ProcedureStepsMultiple flushes until no sanitizer taste/odor detected

Use that table to plan the deep cleans. On a cooler we rent, they’re part of the scheduled service.

Replacing water cooler filters (and who does it on ours)

How often filters need changing depends on how much water goes through them, what’s in that water, and the filter type. Makers of sediment and carbon cartridges often say every few months, sooner if the flow drops or the taste changes. On Aqualume coolers we change them about once a year, and the filters are billed separately. A visitor asked us, “Do I change the filter myself or does a technician have to come out to do this?” On ours, a technician does. On your own unit, shut off the supply and bleed the pressure. Open the housing, fit the new cartridge with the arrow the right way round, flush it, and dispose of the old one properly.

Built-in sanitizing features change the schedule a little. They don’t replace the checks.

What self-cleaning features do, and don't do

Some coolers and dispensers clean themselves in place. Ultraviolet light is used to knock back microorganisms in the water path, and ozone to break down organic matter, so less biofilm builds up. Useful, but limited. Neither stops sediment building up or seals wearing out, and the filters still need changing. If your cooler has one of these features, keep doing the manual checks and the occasional deep clean anyway. On Aqualume machines, sanitization is one of the seven filtration stages, and the scheduled service visits cover the rest.

Even a well-installed cooler has bad days. Most of them have a simple cause, and you can check it yourself.

Troubleshooting common water cooler problems

When something goes wrong after an installation, work from the simplest cause up. Is there water and power? Then narrow it down, try the quick fix, and call for a repair only when it looks mechanical, electrical or plumbing related. The table matches each symptom to the likely cause and what to try first. Below it are short checks for the three usual problems: no water, a leak, or the wrong temperature.

No water coming out

No water usually means something simple: an empty bottle, a closed valve, an airlock, or a clogged filter. On plumbed-in units it can also be the pump. Check in that order. Is the bottle empty, or is the supply off? Are the valves open? Is the tubing kinked anywhere? Prime it to clear any air. Look at the filter, and swap it if it’s blocked. On a bottleless unit, check the incoming pressure and listen for the pump. If none of that works, it’s probably the pump or a valve, and that’s a job for a technician.

ProblemLikely CauseQuick Fix / When to Call a Pro
No FlowEmpty bottle or closed valveRefill/replace bottle, open valve; call pro if pump failure
Intermittent FlowAirlock or kinked tubingPrime system; re-route tubing; call pro if persistent
Low FlowClogged filterReplace filter; call pro if pressure still low

Simple checks first, in that order. The last column tells you when to stop and call someone.

When the water cooler has no flow

Start at the source. On a bottled cooler, is there water in the bottle? On a plumbed-in cooler, is the isolation valve open? Then look for kinks in the tubing or the suction line, and prime it to clear airlocks. If a filter might be clogged, take it out of the path for a moment to rule it out. Still nothing after all that? It’s likely the pump or a valve. On a cooler you rent from us, repairs are covered: call (833) 426-5863.

Finding and fixing water cooler leaks

Leaks tend to start at one of three places: a fitting, the bottle seal, or a cracked part of the reservoir. Dry everything, then pour a little water and watch where it appears. Tighten fittings gently. Replace a worn O-ring or bottle seal. Look along the tubing for hairline cracks. If the leak is hidden in the plumbing, or keeps coming back, isolate sections and pressure-test them, or call a plumber before it soaks into the floor. Until it’s fixed, put something absorbent underneath.

When the water isn't hot or cold enough

Temperature problems usually come down to the thermostat, the compressor, or impatience. Check the power and the thermostat settings first. Then give it the stabilization time in the manual; cold water takes hours after an install. Make sure nothing is blocking the vents. If it still won’t cool after that, the compressor or refrigerant circuit needs a refrigeration technician. For hot water, check the heating element and thermostat before replacing anything.

Most of these fixes are quick. The ones that aren’t are what a service call is for.

Free 7-day trial

Try a bottleless cooler in your office before you sign.

  • 7-day free trial, we take it back if it isn't right
  • Plumbed in: no jugs to lift, store or reorder
  • A local technician, not a national call centre

Rather talk? (833) 426-5863

*Starting price; final pricing depends on the machine and site.

Choosing the right water cooler, or staying with bottles

If you’re still choosing a cooler, the real decision is how much work you want it to be. Top-load is cheap and simple but means lifting jugs. Bottom-load saves the lifting. Bottleless needs a plumbing install once and then no bottles at all. Beyond type, think about how much water your people drink in a day, how much space you have, and who will do the routine cleaning. The table compares the three on installation difficulty and upkeep. A checklist follows it. No water line anywhere near where the cooler would go? Stay with bottled delivery.

TypeInstallation DifficultyMaintenance Frequency
Top-load water coolerLow (simple bottle handling)Moderate (bottle changes, routine cleaning)
Bottom-load water coolerLow–Medium (tube routing)Moderate (tube inspection, cleaning)
Bottleless water coolerMedium–High (plumbing required)Higher (filter replacement, periodic sanitization)

The trade is simple. A bottleless cooler takes the jug-lifting away but adds a plumbing job and filter changes. If you rent ours, both of those are ours to do.

Types of water cooler and the features that matter

Coolers come in a few types. Top-load and bottom-load take bottles. Bottleless, or plumbed-in, coolers take water from a line, some as countertop dispensers, some with reverse osmosis built in. Features range from hot and cold taps and child locks to touchscreens and self-cleaning systems. Top-load and bottom-load suit offices that already like their bottled delivery. Bottleless suits a building with reliable plumbing near the break room and a team tired of handling jugs. Reverse osmosis adds filtration but makes the installation more involved, and it may need a drain. Then weigh the small things: child safety locks on hot taps, energy use, how the controls work.

A short checklist turns all of that into an actual buying decision:

Before you buy a water cooler

Look past the sticker price to what the cooler costs over its life: filters, bottled delivery if it uses bottles, and service calls. Check you can actually buy replacement cartridges for it, and what the warranty covers. Ask how hard the installation is, and confirm the power and drain needs for plumbed models. For busy sites, a bigger reservoir and panels you can get at for service make life easier. Check your local plumbing code before a bottleless install, or budget for someone who knows it. Renting moves most of this onto the provider. With us, installation is free, and service and repairs are in the plan.

If you’d rather not own any of this, renting is the other route. We rent bottleless coolers in Los Angeles and Orange County, plus the Inland Empire, from $80 a month*, with a 7-day free trial and installation included. For a unit you own, the manufacturer’s manual is the final word on installation details. *Starting price; final pricing depends on the machine and site.

Water cooler installation and setup: frequently asked questions, answered

Common questions about water cooler installation and setup, answered short. The longer versions are in the sections of this guide above. Unbox and inspect first. Place and connect it. Prime and test last. If the job involves reverse osmosis, or building plumbing you’re unsure of, get a professional for the installation. Renting from us? Leave it to our technicians.

How do you set up a water cooler for the first time?

Unbox it and check for damage before the installation. Put it on a level, solid surface near power, and near a water line if it’s bottleless. Connect the water: a bottle for a bottled cooler, a supply line for a plumbed-in one. Prime it to clear the air, then plug it in and give it time to reach temperature, checking for leaks as it does. Read the manual first, use a grounded outlet, and know where the shut-off valve is.

How Do You Set Up a Water Cooler for the First Time?

Inspect it. Choose and prepare the spot. Gather tools. Connect water and power safely, prime it, then test for leaks and temperature. Doing the installation in that order is what keeps a first water cooler setup from turning into a mop-up.

What tools are needed for bottleless water cooler installation?

For a bottleless cooler: adjustable wrenches and Teflon tape, plus a T-adapter or compression fittings and a tubing cutter. Add a drill if anything gets mounted, and a pressure gauge for the supply. Reverse osmosis drains or awkward plumbing are a plumber’s job. Renting from us? You need none of it.

What Tools Are Needed for Bottleless Water Cooler Installation?

The short list: wrenches, Teflon tape, a tubing cutter, screwdrivers, clamps. A pressure gauge helps check the supply, and a drill helps if you’re mounting or routing anything through a cabinet.

How often should you clean your water dispenser?

Manufacturers suggest the drip tray and taps weekly, a wipe of the outside and a seal check monthly, and a deep sanitization every few months, more often in busy spaces. Replace filters on the maker’s schedule, or sooner if flow or taste changes. On coolers we rent, we handle it (filters billed separately).

How Often Should You Clean Your Water Dispenser?

Weekly: drip tray and taps. Monthly: the outside and the seals. Every few months: a full sanitization. Busy break rooms need all of it more often.

Can you install a bottleless water cooler yourself?

On a unit you own, yes: DIY installation works if you’re comfortable with basic plumbing and you follow local code. Long supply runs, reverse osmosis drains or anything code-mandated belong with a licensed plumber. On a cooler you rent from Aqualume, you don’t have to: our technicians install it free.

Can You Install a Bottleless Water Cooler Yourself?

A simple cold-water tap and a compression fitting are within reach of a careful DIYer. Reverse osmosis, drain air gaps and anything that touches the building’s plumbing code are where we’d stop and call a professional. Or skip the question entirely: rent one of our bottleless coolers, plumbed into your existing water line by our technicians during a free installation, and try it free for 7 days.

Ready when you are

Stop buying water by the jug.

A plumbed-in Aqualume cooler gives your team filtered hot and cold water on tap. Try one in your office for 7 days, then decide.

*Starting price; final pricing depends on the machine and site.

Office manager filling a glass from the Aqualume Glacier in an accounting firm kitchenette at night